Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Panel
panelIconIdatlassian-light_bulb_on
panelIcon:light_bulb_on:
panelIconText:light_bulb_on:
bgColor#FFFAE6

The Problem problem being Ineffective Clean Energy Claims happening today and this problem could be fixed using Granular Certificates (Time-Stamped Energy Attribute Certificates).

to the EnergyTag’s

Granular Matching is Happening already !!!It is great to see 24/7 carbon-free energy being a reality as the granular certificate market gets more traction with the addition of more than 20 Case Studiesacross the globe. 

Refer to the EnergyTag’s Blog on the Feasibility of Granular Certificates and Getting Started with EnergyTag.

...

Crucial Attributes of Granular Certificates

atlassian-note
Panel
panelIconId
panelIcon:note:
bgColor#FFFAE6

(blue star) List of Crucial Attributes

  • Energy Carrier (always Electricity).

  • Unique identification number.

  • Date when the Production Device became operational.

  • Production/storage discharge interval, which shall be a maximum of one hour

  • GC Issuance date-stamp.

  • Source of produced energy.

  • Technology used to produce energy.

  • Name of the Production Device.

  • Unique ID of the Production Device (if available).

  • Capacity of the Production Device.

  • Country/region of Issuance.

  • Geographical location of the Production/Storage System that released the energy for which the GC is Issued (including zip code/postcode, street, city and country, and/or GPS coordinate). Where available, GPS coordinates shall be stated.

  • Wh as the base unit rather than a multiple (kWh, MWh, etc.) unit.

  • Volume of energy production represented  (i.e face value of the certificate) rounded down to the nearest Wh whole number.

  • Identity of the GC Issuer.

  • Whether it is Issued from production or released from storage.

  • Whether or not it can be used to inform consumers of the origin of the energy they consume (i.e. Disclosure).

  • Whether or not it has been Issued following Energy Carrier conversion or release from energy Storage.

  • Configuration the GC is issued (i.e. Config-1,2 or 3).

...